Preamble:

WHEREAS the Government of Alberta, through the Ministry of Environment and Protected Areas is responsible for issuing permits under the Water Act and the Environmental Protection and Enhancement Act; and

WHEREAS the Government of Alberta has committed to reducing red tape and streamlining environmental approval processes; and

WHEREAS the cost and time required of municipalities to obtain provincial approvals can delay timely infrastructure repairs;

Operative Clause:

THEREFORE, BE IT RESOLVED that the Rural Municipalities of Alberta (RMA) request that the Government of Alberta (GOA) identify efficiencies within, and streamline, its internal permitting systems, regulations, and approval processes under the Water Act and the Environmental Protection and Enhancement Act.

FURTHER BE IT RESOLVED that the RMA request that the GOA exempt the replacement of culverts and comparable minor drainage infrastructure from Water Act Code of Practice Notification requirements in cases where the design specifications are less than those of a bridge culvert, the replacement does not alter the original structure, and the existing footprint, function, capacity, and environmental impact are maintained.

Member Background:

The Municipal District of Lesser Slave River, located in north-central Alberta, serves a population of approximately 2,800 residents. The municipality is responsible for an extensive transportation network that includes 50 bridge files and more than 2,500 culverts, representing a significant infrastructure inventory relative to its population. In 2026, high spring runoff combined with significant precipitation contributed to numerous culvert failures, road washouts, and road closures throughout the municipality.

Navigating the numerous regulatory approvals, permits, and notifications required to replace underground infrastructure at the end of its service life is considerably challenging on administrative and technical resources in rural municipalities.

The current provincial and federal regulatory framework can significantly delay the replacement of damaged infrastructure and the reopening of roads. In addition, climate change, beaver activity, and other environmental factors are contributing to increasingly variable water levels and flow conditions, both seasonally and from year to year. As a result, an increasing number of previously standard culvert installations now require bridge culvert structures which, under provincial requirements, must be designed by qualified engineering professionals. This increases both project costs and replacement timelines.

Regardless of project size, municipalities are often required to obtain multiple permits, approvals, and authorizations before proceeding with infrastructure replacement. These requirements may include Water Act Code of Practice Notifications, Public Lands Act Notifications, Qualified Aquatic Environment Specialist (QAES) assessments, utility agreements, Alberta One Call notifications, migratory bird surveys, wildlife assessments, damage control licenses, Temporary Field Authorizations (TFAs), and historical resources clearances. The cumulative cost, time, and administrative burden associated with these requirements place significant pressure on rural municipalities already facing substantial infrastructure replacement demands.

Streamlining the environmental permitting and approval process would provide substantial benefits to municipalities throughout Alberta. Approaches may include the establishment of a single-window approval system or exemptions for “like-for-like” infrastructure replacements where the footprint, function, and environmental impact of the existing infrastructure remain unchanged.

Without regulatory improvements, municipalities may be forced to consider permanently closing roads rather than replacing damaged infrastructure. Such decisions can reduce emergency access and egress options for communities already facing elevated risks from wildfires, extreme weather events, and overland flooding. When critical transportation routes remain closed due to delays associated with replacing a relatively small culvert, the broader public safety implications must be considered alongside environmental objectives.

While environmental stewardship remains an important priority, there is an opportunity to achieve both environmental protection and infrastructure resilience through a more efficient, coordinated, and streamlined approval process that provides municipalities with a single point of regulatory coordination rather than multiple independent approvals.

RMA Background:

4-25S: Re-evaluation of Wetlands Policy to Streamline Road Construction and Improvements in Rural Alberta 

THEREFORE, BE IT RESOLVED that the Rural Municipalities of Alberta advocate to the Government of Alberta to amend the Wetland Policy to streamline regulatory processes for rural municipalities in relation to road construction and improvements; 

FURTHER BE IT RESOLVED that the amendments to the Wetland Policy address the unique challenges faced by rural communities when determining wetland mitigation measures and introduce alternative approaches to minimizing costs by ensuring that road construction and maintenance projects are not unduly delayed or hindered by overly restrictive policies. 

Click here to view the full resolution.

Government Response:
None reported.

Development:

None reported.